Engineering Home
Design Guidelines
General Notes
Plan Submittal Requirements
Plan Revision & Record Drawing
Street Design
Street Lights
Streetscape
Signing and Striping
Sanitary Sewer
Storm Drain
Water (potable)
Recycled Water
Landscaping
Map Requirement
Lot Line Adjustment & Lot Combination
Vacation of Public Right of Way
Solid Waste & Recycling
 

City of Milpitas
Engineering Design Guidelines

Lot Line Adjustment & Lot Combination

The information and guidelines contained herein are to be used whenever applicable. In the event a development is to be constructed in stages, master utility plans are required prior to submittal of the first stage improvement plans. The master utility plans shall show all improvements, including interim (phased) and ultimate improvements. For information regarding these guidelines contact the Land Development Section of the Engineering Division, at (408) 586-3329.

Lot Line Adjustment Application Form

Lot Line Adjustment Procedure

Lot Combination

PDF files requires an Adobe Acrobat Reader, which may be downloaded for free.